+7 (701) 759 90 19
USD 388.81 EUR 429.01
RUB 6.08 CNY 55.49
News

Domestic/International terminal connector under construction at Nur-Sultan airport

22 May 2019 12:15
Share in:
Domestic/International terminal connector under construction at Nur-Sultan airport

NUR-SULTAN. KAZINFORM Construction of a new connector began at the Nursultan Nazarbayev International Airport.

The 90m-long passageway will connect domestic and international terminals (T1, T2). Its total area will be 1,000 sq m. The connector will let the passengers walk directly from one terminal to another staying inside.

null
null

The project will be completed in October 2019.


Keywords: Nur-Sultan,
Share in:

Author:

Temirgaliyeva Arailym

+7
Send
Employees online
Editor
Kudrenok Tatyana
Kudrenok Tatyana
954-048
Editor
Raushan Alzhanova
Raushan Alzhanova
954-048
Editor
Temirgaliyeva Arailym
Temirgaliyeva Arailym
954-048

Archive